GW Memorial Parkway: Dead Run & Turkey Run Bridges



Highway &
Bridge

Heavy
Construction

Utility Infrastructure

Concrete & Structures

Design-Build PPTA

Site
Development

 

 



Location Washington, DC
Description From the day the Request for Proposal arrived from the FHWA (Federal Highway Works Administration) the project represented a tremendous challenge not only in construction but also in the bidding process. The task was to replace three 400 foot long bridge decks on a high traffic roadway in six weekends working from 8:00 PM Friday night and reopening the bridge to traffic not later than 5:00 AM each Monday morning. Shirley submitted a technical and cost proposal that detailed how the project was to be constructed and managed, who the personnel would be, and what the project was going to cost. After review of the technical and price proposal Shirley was awarded the project and the race began. The bridges had deteriorating cast in place decks that would require sawcut and removal in sections while simultaneously being replaced with a prestressed concrete member that was then post-tensioned after erection of adjacent members. A detailed plan was formulated and a complete weekend schedule (in half-hour increments) was created to provide for demolition and reconstruction of 200 feet of bridge in a single weekend. The technical and physical challenges were significant as well as contingency plans for inclement weather, traffic accidents, or any number of incidents that can affect a major highway project constructed under traffic. When all was said and done, the execution plan and project went like clockwork and three bridges had the superstructure replaced in a total of six weekends. By the final weekend the plan was refined and so well executed that the bridge was reopened by 5:00 PM Sunday afternoon, a full 12 hours ahead of schedule. What initially took 57 hours to construct was perfected to a 33 hour time frame as the plan included a 10 hour idle period in the final weekend. The planning, execution, attention to detail, and commitment to schedule on this project typify the work product of Shirley Contracting Company LLC.
Value $4.8M
Completion Date Summer 1998
Client FHWA (Federal Highway Works Administration)


< Back to Project list
 

 
© 2004 Shirley Contracting Company LLC. All Rights Reserved.




Shirley Contracting Company, LLC
8435 Backlick Road
Lorton, Virginia 22079-1498
703.550.8100